Avionyx Homepage The Company Solutions Projects Careers Partners FAQ's Contact Us!
         
 
  Avionyx Training Course Outline

Topic: DO-178B Plan for Software Aspects of Certification (PSAC)

Audience: Management and Software Engineers

Length 1-Day

For more information or to register - email or call (866) 625-9396

Part 1 – Overview of the Process

  • FAA Overview
  • RTCA/DO-178B
  • Overall Process
    • Airworthiness Requirements
    • System Operational Requirements
    • SYSTEM LIFE CYCLE PROCESSES
      • System Safety Assessment Process
    • System Requirements Allocated to Software feed-down
    • Software Levels feed-down
    • Design Constraints feed-down
    • Hardware Definition feed-down
    • SOFTWARE LIFE CYCLE PROCESSES (DO-178B)
    • Software Planning Process ( DO-178B Section 4)
      • PSAC, SDP, SVP, SCMP, SQAP, SRS, SDS, SCS, reviews
    • Software Development Processes (DO-178B Section 5)
      • SRD, SDD, CODE, Integration, Trace, reviews
    • Integral Processes
      • SW Verification (DO-178B Section 6)
      • SW Configuration Management (DO-178B Section 7)
      • SW Quality Assurance (DO-178B Section 8)
      • Certification Liaison (DO-178B Section 9)
    • Fault Containment Boundaries feed-back
    • Error Sources Identified/Eliminated feed-back
    • Software Requirements & Architecture feed-back

Part 2 - The PSAC Content in Detail

  • SOFTWARE LIFE CYCLE
    • Project Rigor
    • Software Leveling

·        PSAC Contents

    • Title Page
    • Signature Page – Stake Holders
    • Revision History
    • Table of Contents
    • Introduction
      • Purpose, Scope, References, Acronyms
    • System Overview
      • System Functions
      • Functions Allocated to Hardware & Diagram
      • Functions Allocated to Software
      • Safety Features
    • Software Overview
      • Software Architecture & Diagram
      • Software Functions
      • Interfaces
      • Partitioning, Redundancy, MVDS
      • Timing & Scheduling
      • Fault Tolerance, Failure Detection, Safety Monitoring
      • Coding Languages
    • Certification Considerations
      • Certification Basis
      • Design Assurance Level
      • DO-178B Objectives Fulfilled by the Company
      • DO-178B Independence
    • Software Life Cycle
      • Planning, Requirements, Design, ……………………
    • Software Life Cycle Data (Table)
      • Title, Approval, DO-178B Reference, Submit to
    • Schedule
      • Major Milestones
      • Plans, Requirements, Design, Code, Test, ……..
    • Additional Considerations
      • Alternate Means of Compliance
      • Tool Qualification
      • Previously-Developed Software
      • Option-Selectable Software
      • User-Modifiable Software
      • Commercial of the Shelf Software
      • Field Loadable Software
      • Multiple-Version Dissimilar Software
      • Product Service History
      • Verification Environment
      • Development Environment
      • Supplier Control
      • Requirements Responsibility
      • Other Assurance Requirements
        • Customer Extra Requirements
        • Software Complexity
        • Static Code Analysis
        • Safety Subset of Selected Programming Language

 

BACK TO TOP

 

 

New Avionyx Engineering Facility in Costa Rica

Read More...

RTCA Selects Avionyx to Deliver DO-254 Training

Read More...

Costa Rica ranks third worldwide in outsourcing!
According to a study covered in a recent issue of AmCham's Business Costa Rica, Costa Rica ranks third in countries "ideal outsourcing from the United States".
Read More...


Count on Avionyx
In the last two years alone, Avionyx has participated in the development of more than 20 avionics systems.
More Info…

Get Our Brochure!
You must have adobe acrobat. You can download adobe acrobat here!

 



HOME  |  COMPANY  |  SOLUTION  |  PROJECTS  |  CAREERS  |  PARTNERS  |  FAQ's  |  CONTACT

Copyright Avionyx, Inc. 2008 • All Rights Reserved • Read our LEGAL NOTICE