Avionyx Homepage The Company Solutions Projects Careers Partners FAQ's Contact Us!
         
 
  Avionyx Training Course Outline

Topic: DO-178B Software Configuration Management Plan (SCMP)

Audience: Management and Software Engineers

Length 1-Day

For more information or to register - email or call (866) 625-9396

Part 1 – Overview of the Process

  • FAA Overview
  • RTCA/DO-178B
  • Overall Process
    • Airworthiness Requirements
    • System Operational Requirements
    • SYSTEM LIFE CYCLE PROCESSES
      • System Safety Assessment Process
    • System Requirements Allocated to Software feed-down
    • Software Levels feed-down
    • Design Constraints feed-down
    • Hardware Definition feed-down
    • SOFTWARE LIFE CYCLE PROCESSES (DO-178B)
    • Software Planning Process ( DO-178B Section 4)
      • PSAC, SDP, SVP, SCMP, SQAP, SRS, SDS, SCS, reviews
    • Software Development Processes (DO-178B Section 5)
      • SRD, SDD, CODE, Integration, Trace, reviews
    • Integral Processes
      • SW Verification (DO-178B Section 6)
      • SW Configuration Management (DO-178B Section 7)
      • SW Quality Assurance (DO-178B Section 8)
      • Certification Liaison (DO-178B Section 9)
    • Fault Containment Boundaries feed-back
    • Error Sources Identified/Eliminated feed-back
    • Software Requirements & Architecture feed-back

Part 2 - The SCMP Content in Detail

  • SOFTWARE LIFE CYCLE
    • Project Rigor
    • Software Leveling

·        SCMP Contents

    • Title Page
    • Signature Page – Stake Holders
    • Revision History
    • Table of Contents
    • Introduction
      • Purpose, Scope, General Description, References, Acronyms
    • Envoronment
    • Procedures
    • Tools
    • Methods
      • Identification
      • Change Control
      • Status Accounting
      • Configuration Audit
      • Access
    • Standards
    • Organizational Responsibility
    • Interfaces
    • Activities
      • Configuration Identification
        • Items
        • When
        • Id Methods
        • Relationship of CID to Airborne System & Equipment Id
      • Baselines & Traceability
        • Establishing Baselines
        • What Baselines
        • When
        • Library Controls
        • CI and Baseline Traceability
      • Problem Reporting
        • Content and Id
        • When created
        • Closing
        • Relation to Change Control
      • Change Control
        • Ci’s and Baseline’s to Control
        • When
        • Problem/Change Control Activities That Control Them
        • Pre-Certification Controls
        • Post-Certification Controls
        • Integrity of Baselines and CIs
      • Change Review
        • Feedback to/from SLC Processes
        • Assessing and Prioritizing Problems
        • Approving Changes
        • Resolution and Change Implementation
      • Configuration Status Accounting
      • Archiving, Retrieval and Release
        • Release Method and Authority
        • Data Retention
      • Software Load Control
      • Software Life Cycle Environment Controls
        • CC1 vs CC2
    • Transition Criteria
    • SCM Data
      • SCM Records
      • Software Configuration Index (SCI)
      • Software Life Cycle Environment Configuration Index (SECI)
    • Supplier Control
    • The CM System
      • Screen Shots and Instructions
    • The CM Tools List

BACK TO TOP

 

 

New Avionyx Engineering Facility in Costa Rica

Read More...

Costa Rica ranks third worldwide in outsourcing!
According to a study covered in a recent issue of AmCham's Business Costa Rica, Costa Rica ranks third in countries "ideal outsourcing from the United States".
Read More...


Count on Avionyx
In the last two years alone, Avionyx has participated in the development of more than 20 avionics systems.
More Info…

Get Our Brochure!
You must have adobe acrobat. You can download adobe acrobat here!

 



HOME  |  COMPANY  |  SOLUTION  |  PROJECTS  |  CAREERS  |  PARTNERS  |  FAQ's  |  CONTACT

Copyright Avionyx, Inc. 2004 • All Rights Reserved • Read our LEGAL NOTICE