|
|
|
Avionyx
Training Course Outline
Topic: DO-178B Software Configuration Management Plan (SCMP)
Audience: Management and Software Engineers
Length 1-Day
For more information or to register - email or
call (866) 625-9396
Part 1 – Overview of the Process
- FAA
Overview
- RTCA/DO-178B
- Overall
Process
- Airworthiness
Requirements
- System
Operational Requirements
- SYSTEM
LIFE CYCLE PROCESSES
- System
Safety Assessment Process
- System
Requirements Allocated to Software feed-down
- Software
Levels feed-down
- Design
Constraints feed-down
- Hardware
Definition feed-down
- SOFTWARE
LIFE CYCLE PROCESSES (DO-178B)
- Software
Planning Process ( DO-178B Section 4)
- PSAC,
SDP, SVP, SCMP, SQAP, SRS, SDS, SCS, reviews
- Software
Development Processes (DO-178B Section 5)
- SRD, SDD,
CODE, Integration, Trace, reviews
- Integral
Processes
- SW Verification
(DO-178B Section 6)
- SW Configuration
Management (DO-178B Section 7)
- SW Quality
Assurance (DO-178B Section 8)
- Certification
Liaison (DO-178B Section 9)
- Fault Containment
Boundaries feed-back
- Error Sources
Identified/Eliminated feed-back
- Software
Requirements & Architecture feed-back
Part 2 - The SCMP Content in Detail
- SOFTWARE
LIFE CYCLE
- Project
Rigor
- Software
Leveling
·
SCMP Contents
- Title Page
- Signature
Page – Stake Holders
- Revision
History
- Table of
Contents
- Introduction
- Purpose,
Scope, General Description, References, Acronyms
- Envoronment
- Procedures
- Tools
- Methods
- Identification
- Change Control
- Status Accounting
- Configuration Audit
- Access
- Standards
- Organizational Responsibility
- Interfaces
- Activities
- Configuration Identification
- Items
- When
- Id Methods
- Relationship of CID
to Airborne System & Equipment Id
- Baselines & Traceability
- Establishing Baselines
- What Baselines
- When
- Library Controls
- CI and Baseline Traceability
- Problem Reporting
- Content and Id
- When created
- Closing
- Relation to Change
Control
- Change Control
- Ci’s
and Baseline’s to Control
- When
- Problem/Change
Control Activities That Control Them
- Pre-Certification
Controls
- Post-Certification
Controls
- Integrity
of Baselines and CIs
- Change
Review
- Feedback
to/from SLC Processes
- Assessing
and Prioritizing Problems
- Approving
Changes
- Resolution
and Change Implementation
- Configuration
Status Accounting
- Archiving,
Retrieval and Release
- Release
Method and Authority
- Data
Retention
- Software
Load Control
- Software
Life Cycle Environment Controls
- Transition
Criteria
- SCM Data
- SCM Records
- Software
Configuration Index (SCI)
- Software
Life Cycle Environment Configuration Index (SECI)
- Supplier
Control
- The CM
System
- Screen
Shots and Instructions
- The CM
Tools List
BACK
TO TOP
|
|
|
New Avionyx Engineering Facility in Costa Rica
Read More...
Costa Rica ranks third worldwide in outsourcing!
According to a study covered in a recent issue of AmCham's Business Costa Rica, Costa Rica ranks third in countries "ideal outsourcing from the United States".
Read More...
Count on Avionyx
In the last two years alone, Avionyx has participated in the development
of more than 20 avionics systems.
More Info…
Get
Our Brochure!
You must have adobe acrobat. You can download adobe acrobat here!
|
|